Support tickets are accepted 24/7 Plan locations: DE · NL · PL · FR · USA
Special terms

Migration and terms for your workload

When a standard plan is not enough, we can agree on migration, billing term, network options, and managed work. Scope, location, timing, and price are confirmed before payment.

VPS migration Dedicated servers IPv4 and ports Managed
Hostyrex VPS and server migration
Movemigration and rollback plan
Termterms invoiced before payment
Networkport and IP by location
Manageddefined work scope
Tickets and requests24/7
Tickets and ordersClient area
VPS · Servers · IPone stack
Options

What can be agreed

VPS / Server

VPS or server migration

Before work starts, we define data volume, services, the maintenance window, DNS changes, and a rollback plan. Any discount or included work applies only when confirmed in an invoice or ticket.

Plan before migration
6–12 months

Long-term billing

For a VPS or dedicated server, you can request an individual billing period and price. Only terms shown in the order, invoice, or ticket before payment apply.

No automatic discount
IPv4 / Network

Port and IPv4 networking

We check location availability, port speed, traffic allowance, individual IPv4 addresses or a /24 subnet, RDNS, GRE, and ACL. Price depends on the site and configuration.

Availability check
Managed

Managed launch

For managed workloads, we define the OS and control panel, monitoring, backups, responsibility boundaries, and response time for the selected plan.

Agreed scope
Request

What to provide for an accurate quote

What to includeWhy it matters
Current server, current location, and preferred destinationto check a suitable configuration and network availability
Data volume, services, control panel, and acceptable downtimeto prepare migration, DNS switch, and rollback steps
CPU, RAM, NVMe, GPU, port, traffic, and IPv4 requirementsto avoid quoting a plan that does not fit the workload
Billing term, managed work, and backup requirementsto define price, work scope, and responsibility boundaries